क्रोम प्लेटेड बार स्थापित करते समय अंक

Apr 28, 2020

1. In order to improve the assembly quality of the equipment, before installation, ensure that the clearance between the piston and the cylinder meets the requirements. And check whether the tolerances of the cylinder liner are qualified.

2. After the inspection of the equipment cylinder chromium plating rod is qualified, when installing a new sealing rubber ring, the sealing rubber ring should be flat and not twisted. And in this process, the oil must not stick to prevent the rubber from becoming soft and the elasticity weakening to lose the sealing effect. At the same time, an appropriate amount of sealant can be applied around the seal ring. The application should be continuous, uniform and without interruption.

3. Put the cylinder into the cylinder block, press the cylinder liner evenly with both hands to press it into place. And check that each cylinder is higher than the height of the upper plane of the cylinder block, so as not to deform the cylinder head or tighten the seal when tightening the bolts of the cylinder block.

4. If there are conditions, after the cylinder head gasket and cylinder head are installed, no leakage is considered as qualified.

5. सामान्य परिस्थितियों में, क्रोम - प्लेटेड रॉड पिस्टन से जुड़ा होता है और क्रोम - प्लेटेड रॉड से जुड़ा होता है, इसलिए यह सावधानीपूर्वक निर्धारित करना आवश्यक है कि क्या मजबूती से जुड़ा हुआ है और लॉक होना चाहिए। कनेक्शन भागों के पहनने और अनुचित कनेक्शन के कारण भी कई समस्याएं हैं।